Installed new Stack Pack on Lady Charlotte and test sailed.
Century Club: Timothy Dull
Returned to NOB after haulout. All systems worked well.
Cobb's hauled the boat, I spent the week sanding and bottom painting and repaired centerboard. In addition lubed the three thoughhull fittings, Replaced the shaft zinc. Repaired bow block fitting with new teak block.
Value and Condition Survey conducted for GEICO. Added anti-freese to sea water side of engine.
Motored to Hampton on Friday, joined the parade of lights on Saturday and motored back to NOB on Sunday before the storm.
Replaced strings of lights damaged by snow storm and winds after Norfolk Lighting Ceremonies. Ready for lighted boat parades in Hamton and at the Naval Base!
Repaired fuel system leak on friend's boat in NNSC Marina, test ran after repairs and cleaned up bilge.