10 Boat Maintenance Days

Trip dates: 
Saturday, January 2, 2021 to Monday, August 16, 2021
Trip length: 
10 days
Type of watercraft: 
Sail
  • Rebuilt PAR freshwater pump
  • Installed 50w solar panel and controller
  • Rebedded leaking ports
  • Seasonal oil change, sample sent off for analysis
  • Replaced stern light fixture
  • Repaired faulty VHF antenna wiring
  • Replaced anchor light fixture, conducted upper rigging inspection/taping
  • Installed new anchor (Rocna Vulcan 15kg)
  • Replaced worn Martec with fixed Campbell Sailor due to vibration
  • Replaced cutless bearing