- Rebuilt PAR freshwater pump
- Installed 50w solar panel and controller
- Rebedded leaking ports
- Seasonal oil change, sample sent off for analysis
- Replaced stern light fixture
- Repaired faulty VHF antenna wiring
- Replaced anchor light fixture, conducted upper rigging inspection/taping
- Installed new anchor (Rocna Vulcan 15kg)
- Replaced worn Martec with fixed Campbell Sailor due to vibration
- Replaced cutless bearing