Trip dates:
Friday, March 20, 2026
Trip length:
1 day
Type of watercraft:
Sail
Wind was 10-13SW but we reefed because it was projected to go much higher. Was gusty and shifty until we got out past ft mchenry. Wind mostly petered out by the time we back to dominoes though. I needed another half hour to get my 4+hrs on the water so we headed to rusty scupper around the dredging barge and sailed around a bit there before docking. Lovely overcast day.



