Back to the yard to replace a trim tab

Trip dates: 
Tuesday, October 11, 2022
Trip length: 
1 day
Type of watercraft: 
Power
  • second haulout in a week

Zipwake system, port interceptor, not working.  Need it functional for the trip to Florida for the winter.  So, back to the yard for a haul and block so J Gordon Co can do the work this week. Assuming all goes well, we start south on Saturday.