With a "new-to-us" boat there has been a long list of items that need to addressed. Currently at 75 days of maintenance (only 10 count), areas that have been tackled include the following:
- Bilge pump replacement (install new foundation for the pump, physically install and wire the new pump, fabricate and install spacers needed for bilge pump switch holder.
- Reinstalled A/C pump as it had to be moved to accommodate the new bilge pump.
- Sand and clean saildrive and hull around rudder bearing. Tape and mask to apply 2 coats of AF to the saildrive and around the rudder bearing
- Fabricated and then installed boom mounted lazy jacks
- Moved lower engine hatch strut mounts to accommodate 2 inch longer struts and install the new struts. Tied fuel lines back to avoid interference with the closed hatch strut.
- Ground out keel root crack (superficial) and spent numerous days grinding then doing fairing prep prior to boat bottom being repainted.
- Installed software updates for the Zeus plotters, NAC-3, HV 20/20 displays
- Installed new nitrogen struts in the port aft cockpit locker
- Created templates for the fore and aft shape of the head fresh water tank that I'm manufacturing. Tank to be installed under the floor in front of the head sink.
- V-Berth: moved the upper attach point of the lid pressure strut aft two holes to reduce the adverse load at the lid hinge.
- And the list goes on and on.......