Boat winterization part 2

Trip dates: 
Sunday, November 24, 2024
Trip length: 
1 day
Type of watercraft: 
Sail

At the boat to finish winterizing systems.  All done except engines and potable water system (needed for transit to the boatyard in late December).  Also worked aloft and replaced the ultrasonic wind sensor. Quite cold working aloft in the November wind!