From Late August into mid September the good folks from Haven Harbour has the boat for a list of things (repairs and upgrades) I wanted done before I head south to Florida for the winter. One of the upgrades was swapping the original single Racor filter for a dual Racor filter system.

The installation was very professionally done but the engine data screen freaked out upon restart. The engine hours were wrong and frozen at 428 (I had 590 on the engine at that point). Every start resulted in a series of engine communications error messages. The engine ran fine but the error messages were disconcerting.

So, after a couple unsuccessful efforts to sort it out at home and on a cruise, it was back to Haven Harbour for resolution. The folks from Shore Power Solutions will visit the boat plug into the ECM with their laptop and figure it out.