Boat work / installed new bilge pump

Trip dates: 
Thursday, February 29, 2024
Trip length: 
1 day
Type of watercraft: 
Sail

Installed new bilge pump and hooked up plumbing to the freash water pump. Also repaired end of cooling water hose to the water jacket outlet of the engine.