Completed clear rebuild, Mill Ck and The Beacon for lunch

Trip dates: 
Thursday, July 17, 2025
Trip length: 
1 day
Type of watercraft: 
Power
  • The Sailfish 2660cc at The Beacon at Chesapeake Harbor

Finally wrapped up the rebuild and reinstall of the port stern pull up cleat. Turned out great but the process of removal and reinstall was all done by feel with a long socket extension and not something I want to repeat. Celebrated by cruising over to Mill Creek and then to The Beacon for lunch.