I went over near the Bay Bridge to check out some barges that have been anchored out there. The barges have new and old sections of decking for the construction work that has been going on at the Bridge. The old sections will be sunk for fish sanctuaries.

Trip dates: 
Sunday, September 29, 2024
Trip length: 
1 day
Type of watercraft: 
Power