Submitted by Terry Slattery on Sat, 12/18/2021 - 18:31 Trip dates: Sunday, November 14, 2021Trip length: 1 dayType of watercraft: Sail Lux work day 10 Removed the main and jib. Worked on the new water heater connections. Replaced flexible piping that was leaking.