Lux work day - winterization

Trip dates: 
Saturday, November 19, 2022 to Sunday, November 27, 2022
Trip length: 
2 days
Type of watercraft: 
Sail

11/19: Winterize Lux. Water system, aircon, heads, genset, engines, remove genoa.

11/27: Winterize Lux. Make a fitted tarp to cover the mainsail sailbag for the winter.