Trip dates:
Wednesday, December 4, 2024
Trip length:
1 day
Type of watercraft:
Power
Gary and I took Mainship over to Long Key Marina 1030am. Lots of ice to go thru - even on Oyster Creek. Bay was fine. Hauled out with travel lift - looked very clean, even on the running gear. Was cold but sunny - about 42 deg. Once they blocked it up, we ran the pink thru the engine and into a bucket. All winterized and safe from freezing temps.