Mainship Haulout

Trip dates: 
Wednesday, December 4, 2024
Trip length: 
1 day
Type of watercraft: 
Power

Gary and I took Mainship over to Long Key Marina 1030am.  Lots of ice to go thru - even on Oyster Creek.  Bay was fine.  Hauled out with travel lift - looked very clean, even on the running gear.  Was cold but sunny - about 42 deg.  Once they blocked it up, we ran the pink thru the engine and into a bucket.  All winterized and safe from freezing temps.