Maintenance Day 7 - Sanding and painting exterior woodwork

Trip dates: 
Friday, March 25, 2022
Trip length: 
1 day
Type of watercraft: 
Other

Worked on the exterior wood.    Sanded, wiped down with acetone, taped up, and gave it two coats of Cetol light.