Trip dates: 
Sunday, August 23, 2020
Trip length: 
1 day
Type of watercraft: 
Power
Two half workdays equal a full one, and boy the results are great. First step was heat gun and scraping the old adhesive from where the chaps had been; second phase was using solvent to remove the last bits. Still have to fix the rub rail, but she looks so much better!