Trip dates:
Friday, October 17, 2025 to Tuesday, October 21, 2025
Trip length:
5 days
Type of watercraft:
Power
'tis the season. I have been on the boas every day at the dock and out maneuvering. Two boats came off the lifts and onto trailers. The big boat will be winterized later this week and off to Rock Hall for land storage. They will all stay there for the winter while the dock and bulkhead are replaced. It will be great in the spring but, for now, not so much fun.

