Sunrise and t-top re-lacing

Trip dates: 
Saturday, August 30, 2025
Trip length: 
1 day
Type of watercraft: 
Power

Fiery sunrise viewing to start the day. Back at the dock I re-laced the mesh storage system that hangs below the t-top. The zipper was replaced by Marty's Bag Works and everything is back in service.

Day 98!!