Trip dates:
Saturday, September 20, 2025
Trip length:
1 day
Type of watercraft:
Sail
Maintenance Day. Finished the functional parts of my portable washdown system, and tested it by starting to clean the carpet of seagull poo that had been laid down on the trimaran. Pump works great, very helpful given there is no running water at the pier, and I don't want the extra weight permently installed on the boat!