Submitted by Douglas Ellmore on Fri, 03/27/2020 - 13:23 Trip dates: Saturday, March 21, 2020Trip length: 1 dayType of watercraft: Sail Worked on electronics integration. Updated and rewired cables after lowering pod & cutting down binnacle frame rail to see over.