Working on Boats

Trip dates: 
Monday, March 31, 2025 to Sunday, November 30, 2025
Trip length: 
10 days
Type of watercraft: 
Sail

I spent far more than the 10 days allowed working on my boats. Specifically, I put up and took down sails and canvas; cleaned the inside and outside of the boats many times; loaded and unloaded cushions, safety equipment, boat equipment, propane tanks, galley items, provisions, and personal clothing and gear; santiized, filled up and emptied the water tanks; washed and set up lines and bumpers; secured the boats for pending storms; loaded and secured the outboard engine; inflated, cleaned,and deflated and stored the dinghy; moved kayaks from basement storage for the winter to the dock and back to storage; and much more.