Submitted by David Stalfort on Mon, 10/12/2026 - 10:32 Trip dates: Friday, October 2, 2026Trip length: 1 dayType of watercraft: PowerRepositioned the Cape Dory mooring after the Nor’easter. Moved CD to mooring. With Alan Bomar