Boat Work on the Hard!

Trip dates: 
Friday, April 9, 2021 to Thursday, April 22, 2021
Trip length: 
10 days
Type of watercraft: 
Sail
  • Keel Work

Stripped and faired the keel. Reworked some throughulls. Painted the bottom.