Trip dates:
Thursday, September 21, 2023
Trip length:
1 day
Type of watercraft:
Sail
9/12: Motored out to R2 and back to check whether the port saildrive seal work successfully stopped the leak - it didn't - but determined that the leak is not from the shifter shaft.