Trip dates:
Saturday, February 26, 2022
Trip length:
1 day
Type of watercraft:
Sail
Replacing all the old standing and running rigging to the boat. Full day of splicing, load testing, and on-land functionality testing. Also repaired crumbling mast rotation arm and failing rivets on the mast/boom.


