Time to "Summerize"

Trip dates: 
Thursday, May 21, 2020
Trip length: 
1 day
Type of watercraft: 
Power

With COVID-19 pandemic restrictions moderating a bit we are planning our departure from FL and return to MD. Finally!  Much like our prep for winter in Annapolis, the boat here in FL needs to be prepared for summer (and hurricane season).  Today I added fuel stabilizer, ran the engine, opened the drain plug, removed the sparkplugs and fogged the cylinders, added the heavy cover, strapped the boat down to the lift and raised the lift to 6' above MHHW. Sound familiar?

 

Back in Annapolis over Memorial Day weekend.  Next report will be on the big boat, I hope.