Work Day #1

Trip dates: 
Monday, March 15, 2021
Trip length: 
1 day
Type of watercraft: 
Sail

Removed the winter cover from the boat.   The cover is a Fairclough cover that extends to the waterline and uses a substantial metal and wood framework to support it.   Cover and framework were removed and stored.