Work Day 10 Bottom Painting

Trip dates: 
Thursday, May 7, 2020
Trip length: 
1 day
Type of watercraft: 
Sail
  • Before
  • After

It's been a couple of weeks since I've made an entry as I'm held prisoner from sailing due to waiting for the machine shop to produce some rudder bearings.  None the less, a lot of projects have been moving forward and I'm claiming my 10th work day having painted the bottom of the boat with two gallons of Pettit Trinidad SR.  Soon, I'll be in the water hopefully.

Before and after.