7/19/2022: Work on Catamaran Moana (Clamshell install over vents)
10/18/2022: Rakali interior cleanup
11/08/2022: Work on Catamaran Moana (assisted with general maintenance to get boat ready for her skipper to go south for the winter)
11/10/2022: Rakali antenna replacement, cleaning boat interior in preparation for our standard winterization process
11/18/2022: Winterization of fresh water system, pump out delayed due to low tide and inability to get boat off the lift
11/19:2022: move Rakali to the pump out, return to alternate slip as tide was too low to put on the lift and winterize the head. Also fixed interior trim and replaced sink faucet in the head.
11/26/2022: so when your spouse is too big to fit into the small space where the rudder quadrant is located, you get the job. Shoe horned myself into the space and fixed a few grounding wires that had corroded. Mark attached the new terminal ends and I did the routing and attaching of the wires in the small space.