Rebuilt the head the head input valve and fitted electrical wire switch. Finally got the head to work in electric mode!
Century Club: Douglas Ellmore
After receipt of custom bilge pump connector, wired in new connector and new fittings. Very tight work.
made and installed new lazy jacks
Had to remove old shower pump and engineer a new pump placement, with custom parts.
Went to boat and worked on installing shower drain pump, aeronometer sensor, and some running riggingwork. Installed house battery and ran motor.
Started up motor and charged batteries. Checked sea cocks for leaks. Cleaned galley sink and drain.
Needed to add a little reinforcement for the bimini frame to the rear rail. Prevents it from banging and adds stability at two corners.
Completed installation and testing of nav station components. Main marine VHF with AIS receive and wireless mic. Backup VHF marine radio with remote wired mic at helm. Older chart plotter for integration with autopilot. Ham Radio for HF email and chart plotting. Backup handheld GPS and compass. AM/FM/CD stereo for music!
Worked on electronics integration. Updated and rewired cables after lowering pod & cutting down binnacle frame rail to see over.